What the public record says
remove all layers of existing roof to expose decking, install a self-adhering 4" strip over all plywood joints in the roof decking, Install the high temperature water barrier underlayment in the valleys and other designated areas of the roof, install one ply of synthetic felt, install new drip edge around entire perimeter of roof, install precut starter strips on the perimeter of the roof, install a limited lifetime warranted architectural shingle with premium hip/ridge cap shingles, replace all lead flanges and galvanized jack and caps as needed, reuse all existing flashing, and reuse existing skylight and skylight flashings PLEASE NOTE: Re-roofing permits DO NOT require an inspection from Safety and Permits, instead please upload the following photos to this permit PHOTOS REQUIRED 4 geotagged photos (one from each side) showing: Removal of existing roof material Installation of water intrusion resistant underlayment Installation of the drip-edge and flashing Installation of shingles or metal panels Once all applicable photos have been uploaded to the permit, please email [contact removed] requesting permit closure. http://onestopapp.nola.gov/
Recorded milestones
- Application recorded
- Permit issued
Milestones apply to the recorded permits. They do not confirm that an entire development is complete or a business is open. No opening date is inferred.
Sources & confidence
Category labels may be inferred from official fields and scope descriptions. Related permits are grouped only where an explicit source project identifier is available. We do not combine unrelated permits merely because they share an address.
View original city source ↗Retrieved 11/12/2026, 4:00:18 PM. Latest successful source retrieval.