What the public record says
Replace existing outdated electrical meter main panel with a new Eaton 200-amp outdoor meter-main combination panel, Type BR, 40-space/40-circuit, surface-mounted enclosure, while maintaining the existing 200-amp electrical service capacity. Install new overhead electrical service conduit extending vertically through the existing roof, including an approved roof jack, weatherproof flashing, and all necessary fittings to provide a watertight roof penetration. All work shall be performed in accordance with the attached Project Scope Drawing, illustrating the proposed electrical panel installation, overhead service conduit routing, roof penetration, and associated installation details. Reconnect existing electrical circuits, verify proper grounding and bonding, and test the completed installation. All electrical work shall comply with the 2023 NEC (National Electrical Code), applicable 2024 I-Codes (International Codes), City of Mesa requirements, manufacturer specifications, and utility company standards. Upon completion, test the electrical installation and prepare for final inspection and utility reconnection.
Recorded milestones
- Permit issued
Milestones apply to the recorded permits. They do not confirm that an entire development is complete or a business is open. No opening date is inferred.
Sources & confidence
Category labels may be inferred from official fields and scope descriptions. Related permits are grouped only where an explicit source project identifier is available. We do not combine unrelated permits merely because they share an address.
View original city source ↗Retrieved 11/4/2026, 4:00:18 AM. Latest successful source retrieval.