← Mesa discovery
Residential · Housing

1449 80TH

Residential project

Issued

What the public record says

Please note that before a damage permit is issued an estimate showing the Company doing the work, the subject address, scope of work, materials, and labor from either the contractor or the insurance company will be required. A written scope of work is required to approximate the cost of the permit, verbal estimations shall not be used. A completed Contractor Verification Form must also be submitted prior to being issued a permit. This structure is to be restored like for like construction in compliance with 2023 NEC, 2024 IRC/IBC requirements. Any alterations or changes will require submitting plans before any restoration can begin. During the damage inspection the following was observed: No damage to any structural members Electrical sustained minor damage. Replace damaged wire per 2023 NEC and/or 2024 IRC/IBC. Any exposed wires that are not code compliant/damaged/or create life safety must comply with 2024 IRC/2023 NEC. Mechanical equipment was damaged, and all mechanical components will need replacing. Plumbing does not appear to be damaged Note: Any structural members charred to a depth of 1/8” or greater are to be replaced. All plumbing, electrical and mechanical systems damaged by heat are to be replaced. A. Building is: Residential B. Building permits and inspections are required for the following phase (s) of construction: 1. Structural No 2. Electrical Yes 3. Mechanical Yes 4. Plumbing Yes 5. Construction Plans Required No Electrical service can be restored under the following conditions: Electric may be restored during restoration, however if work goes beyond the scope of work or if work is being done without a permit, the City of Mesa reserves the right to remove the meter immediately. Natural gas service can only be restored after a gas test has been approved by the building inspector.

Permit typeRES
Declared job valueNot supplied
Permit recordPMT26-18952
Related permitsPMT26-18952

Recorded milestones

  1. Permit issued

Milestones apply to the recorded permits. They do not confirm that an entire development is complete or a business is open. No opening date is inferred.

Sources & confidence

Category labels may be inferred from official fields and scope descriptions. Related permits are grouped only where an explicit source project identifier is available. We do not combine unrelated permits merely because they share an address.

View original city source ↗

Retrieved 11/5/2026, 1:20:20 AM. Latest successful source retrieval.

One email a week about your area.

New permits, local headlines and businesses near you. Unsubscribe any time.

Sign up freeLocal servicesContact us