What the public record says
Please note that before a damage permit is issued an estimate showing the Company doing the work, the subject address, scope of work, materials, and labor from either the contractor or the insurance company will be required. A written scope of work is required to approximate the cost of the permit, verbal estimations shall not be used. A completed Contractor Verification Form must also be submitted prior to being issued a permit. This structure is to be restored like for like construction in compliance with 2023 NEC, 2024 IRC/IBC requirements. Any alterations or changes will require submitting plans before any restoration can begin. During the damage inspection the following was observed: Structural members have been damaged by and will need an engineers observation letter. Electrical sustained damage to several home runs, panel may not need to be replaced unless it can?t accommodate the requirements needed to comply with 2024 IRC/IBC and/or 2023 NEC. All damaged wires must be replaced per 2023 NEC/2024 IRC. Mechanical equipment was damaged, and all mechanical components will need replacing. The plumbing was damaged Note: Any structural members charred to a depth of 1/8” or greater are to be replaced. All plumbing, electrical and mechanical systems damaged by heat are to be replaced. A. Building is: Residential B. Building permits and inspections are required for the following phase (s) of construction: 1. Structural Yes 2. Electrical Yes 3. Mechanical Yes 4. Plumbing Yes 5. Construction Plans Required No Electrical service can be restored under the following conditions: Electric may be restored during restoration, however if a damage permit is not obtained and/or repairs have not started within 45 days of the damage inspection, the City of Mesa reserves the right to remove the meter immediately Natural gas service can only be restored after a gas test has been approved by the building inspector.
Recorded milestones
- Permit issued
Milestones apply to the recorded permits. They do not confirm that an entire development is complete or a business is open. No opening date is inferred.
Sources & confidence
Category labels may be inferred from official fields and scope descriptions. Related permits are grouped only where an explicit source project identifier is available. We do not combine unrelated permits merely because they share an address.
View original city source ↗Retrieved 11/4/2026, 4:00:18 AM. Latest successful source retrieval.