What the public record says
Replace beverage equipment and associated MEP with new. Demo identified equipment, drains, water lines, refrigeration lines, and floor sinks. Remove power back to electrical panel for demolished equipment. Install new equipment, waste lines floor sinks, water lines, beverage lines, power for new equipment. Replace existing RTU glycol chiller condensing unit with new. Results in CofC
Recorded milestones
- Permit issued
Milestones apply to the recorded permits. They do not confirm that an entire development is complete or a business is open. No opening date is inferred.