What the public record says
The project consists of the phased reconfiguration of the existing conference room and phone booth areas, including modifications to the existing demountable partition systems, construction of new demising soffits, demolition of existing demising soffits, and recladding of the existing operable partition. The work will be performed in two phases to maintain operations and minimize disruption to the occupied space.Demolition activities include the removal and reclamation of existing light fixtures for relocation, removal and storage of existing carpet tile flooring for reuse, removal of doors and hardware, removal of existing furniture and fixtures, demolition of existing acoustical ceiling tile (ACT) systems and grid, removal of existing bulkheads associated with demountable partitions, removal of the existing operable partition, demolition of drywall partitions, removal of existing base, and removal of temporary walls as required. Existing demountable partitions and operable partition components will be carefully decommissioned and salvaged for reuse where indicated.Architectural work includes furnishing and installing new drywall partitions, new bulkhead soffits to accommodate demountable partition systems, new acoustical ceiling tile and grid systems, a new closet door complete with frame and hardware, and miscellaneous patching and repairs required as a result of demolition and reconfiguration activities. Existing carpet tile flooring will be reinstalled following completion of the construction work, including minor floor preparation as required. New base shall be furnished and installed throughout the renovated area where required. All new and existing walls and affected surfaces within the work area shall be prepared and painted to provide a complete finished installation.Temporary construction barricades shall be furnished, installed, maintained, and removed for both Phase 1 and Phase 2 of the project to ensure safe separation between construction activities and occupied areas.Mechanical work includes modifications to the existing HVAC systems to accommodate the revised layout, including relocation of existing air outlets, relocation of thermostats, rebalancing of VAV systems to achieve design airflow requirements, installation of new ductwork serving relocated air outlets, relocation of transfer ducts, HVAC building management system (BMS) control modifications, and other associated mechanical adjustments required by the final layout.Fire protection work includes the relocation of existing sprinkler heads to accommodate the new room configuration, allowance for relocation of up to twenty-five (25) sprinkler heads, and capping of existing sprinkler piping and heads no longer required.Electrical work includes safing off and disconnecting existing electrical components scheduled for removal or relocation, relocation of existing power outlets, light fixtures, light switches, occupancy sensors, vacancy controls, and associated wiring. New power outlets and telecommunications/data stub-ups shall be furnished and installed as required to support the revised room layout and operational requirements. Telecommunication, data, security, and associated low-voltage infrastructure shall be relocated or extended as necessary to serve the reconfigured spaces.The completed work shall provide a fully functional conference room and phone booth configuration, including all architectural, mechanical, electrical, fire protection, and low-voltage modifications necessary to support the new layout and intended use of the space.
Recorded milestones
- Permit issued
Milestones apply to the recorded permits. They do not confirm that an entire development is complete or a business is open. No opening date is inferred.
Sources & confidence
Category labels may be inferred from official fields and scope descriptions. Related permits are grouped only where an explicit source project identifier is available. We do not combine unrelated permits merely because they share an address.
View original city source ↗Retrieved 11/4/2026, 5:40:18 AM. Latest successful source retrieval.