What the public record says
2nd Flr Roof Deck:Install Door: Remove window, window casings on both interior and exterior, demo framing, frame in rough opening for 34"x80" door.Replace interior and exterior casing, install hardware (homeowner to provide pre-hung door and hardware).Built step up on interior to integrate level of the interior of door to higher deck level. Integrate interior step with first step on staircase.Roof Replacement: Demo and haul rubber roofing and any rotten sheathing. Replace any rotted sheathing with 3/4 OSB plywood. Install 1/2" layer of insulated fiberboard. Glue down a 7'x37' 60mil EPDM rubber roof membrane, metal drip edge, 8" of flashing up the house wall, remove and reinstall gutter and downspouts. Lay down rubber tread strips under joists for roof protection.Deck: Build 7x25 deck using 5/4x6 Mahogany decking with hidden fastener system, glue and plug face screws along perimeter.Install 4x4 PT posts, wrap with Acre (rice husk composite by Modern Mills) trim, Mahogany caps, rails, and balusters. Oil-based primer and 2 coats of latex on posts, caps, rails and balusters to match house color. Penefin oil on decking.Railings set at 36" to meet code.
Recorded milestones
- Permit issued
Milestones apply to the recorded permits. They do not confirm that an entire development is complete or a business is open. No opening date is inferred.
Sources & confidence
Category labels may be inferred from official fields and scope descriptions. Related permits are grouped only where an explicit source project identifier is available. We do not combine unrelated permits merely because they share an address.
View original city source ↗Retrieved 11/4/2026, 5:40:18 AM. Latest successful source retrieval.