What the public record says
This project consists of interior and exterior renovations, structural framing modifications, and a third-floor addition, including new deck construction, roofing replacement, siding installation, and full MEP upgrades.All work shall comply with:Massachusetts State Building Code (780 CMR)Cambridge Building Department requirementsOSHA safety regulationsApproved architectural and structural plans 1. DEMOLITION & SITE PREPARATIONSelective demolition will be performed to accommodate new structural layout:Removal of existing roofing system (shingles and components)Removal of second-floor ceilingsDemolition of interior non-load-bearing and load-bearing walls (as per plans)Removal of closets and existing finishesDisconnection and safe removal of affected electrical, plumbing, and HVAC systemsSite Preparation Includes:Protection of adjacent structures and finishesDust control and debris managementDumpster placement and haulingSite maintained in safe and clean condition2. STRUCTURAL FRAMINGFraming work includes:Construction of new interior wall layoutFraming of closets and partition wallsStructural framing for new stair systemFull framing of third-floor additionRoof framing (rafters or trusses)Window and door rough openingsAll framing shall:Comply with engineered drawingsUse code-compliant lumber and fastening systemsInclude required load-bearing supports, headers, and reinforcements 3. DECK CONSTRUCTION (MULTI-LEVEL)First Level Deck:Installation of sonotubes and concrete footingsStructural framing (posts, beams, joists)Second & Third Level Decks:Full structural framingInstallation of decking boardsInstallation of guardrails and handrailsIncludes:Code-compliant stair constructionProper anchoring to structureCompliance with live load and safety requirements 4. EXTERIOR SIDING SYSTEMSurface preparation and inspectionInstallation of weather-resistant barrier (house wrap)Installation of siding materials per manufacturer specificationsInstallation of flashing around windows, doors, and penetrationsInstallation of trim and sealing of jointsSystem designed for:Moisture protectionThermal performanceLong-term durability 5. ROOFING SYSTEMInspection of roof deckInstallation of underlayment and ice/water shieldInstallation of asphalt shingles (or approved material)Installation of flashing, drip edge, ridge ventsAll roofing work:Meets manufacturer specificationsEnsures proper ventilation and drainageProvides full weatherproofing 6. PLUMBING SYSTEMInstallation and modification of plumbing linesRough and finish plumbing connectionsInstallation of fixtures (as applicable)All work:Compliant with Massachusetts Plumbing CodePressure tested and inspected 7. ELECTRICAL SYSTEMInstallation of new wiring and circuitsPanel updates (if required)Installation of outlets, switches, and fixturesAll electrical work:Compliant with NEC and Massachusetts Electrical CodeSubject to inspection and approval8. INSULATIONInstallation of thermal insulation in walls and ceilingsCompliance with Massachusetts energy code (IECC)Air sealing where required9. DRYWALL & PLASTERInstallation of drywall on walls and ceilingsTaping, joint compound, and sandingPlaster finish where required10. INTERIOR FINISHESInterior painting (primer + finish coats)Finish carpentry (trim, baseboards, moldings)Hardwood flooring installationTile installation in designated areas11. GUTTERS & DRAINAGEInstallation of gutter systemProper drainage away from structure12. GENERAL CONDITIONSDaily site cleanup and debris removalWork performed during normal construction hoursCoordination with inspections at required stagesAll work performed in accordance with approved plans
Recorded milestones
- Permit issued
Milestones apply to the recorded permits. They do not confirm that an entire development is complete or a business is open. No opening date is inferred.
Sources & confidence
Category labels may be inferred from official fields and scope descriptions. Related permits are grouped only where an explicit source project identifier is available. We do not combine unrelated permits merely because they share an address.
View original city source ↗Retrieved 11/4/2026, 5:40:18 AM. Latest successful source retrieval.