What the public record says
Roof tear off and replacement of existing roof systems with a combined roof area of approximately 60' x 50' (3,000 square feet). *Complete removal and disposal of the existing roofing systems down to the existing substrate. • Furnish and install Carlisle SynTec InsulBase Grade II (20 PSI) Polyiso Insulation. • Furnish and install a Carlisle SynTec 45-mil Sure-Seal EPDM membrane. • Install a fully tapered insulation system to provide positive drainage. • Install two scuppers at the rear of the building. • Provide and install a cricket to divert water toward the rear scuppers and improve drainage. • Complete roof installation as per code and the Carlisle manufacturer's installation instructions. *** Attached Neg. Asbestos Survey *** <div><br></div><div>*** All separate required mechanical, electrical and plumbing permits must be applied for as needed per permit. *** </div>
Recorded milestones
- Permit issued
Milestones apply to the recorded permits. They do not confirm that an entire development is complete or a business is open. No opening date is inferred.
Sources & confidence
Category labels may be inferred from official fields and scope descriptions. Related permits are grouped only where an explicit source project identifier is available. We do not combine unrelated permits merely because they share an address.
View original city source ↗Retrieved 11/3/2026, 8:30:22 AM. Latest successful source retrieval.