Issued

What the public record says

The floor surrounding the floor drain and area in between the foundation wall and the drain will be broken up and removed. A hole will then be excavated large enough to accommodate a sump pump basin. The floor drain trap will be cut out and capped, and a plastic sump pump basin will be installed. The trench will be backfilled with crushed stone, and the concrete will be replaced. A Zoeller 1/3hp sump pump will be installed along with a 1.5” pvc discharge. The discharge will exit the rear corner of the house and tie into the rain conductor. A dedicated circuit with wiring and single receptacle will be installed for the pump to plug into. A manual gate valve will be installed on the laundry tub drain line for emergency use. plus water-powered backup w sump install -- Only valid with water pressure and volume test to confirm minimums are met.

Permit typePLUMBING
Declared job value$5,500
Permit recordPLUM26-9714217
Related permitsPLUM26-9714217

Recorded milestones

  1. Permit issued

Milestones apply to the recorded permits. They do not confirm that an entire development is complete or a business is open. No opening date is inferred.

Sources & confidence

Category labels may be inferred from official fields and scope descriptions. Related permits are grouped only where an explicit source project identifier is available. We do not combine unrelated permits merely because they share an address.

View original city source ↗

Retrieved 11/6/2026, 7:20:19 PM. Latest successful source retrieval.

One email a week about your area.

New permits, local headlines and businesses near you. Unsubscribe any time.

Sign up freeLocal servicesContact us