What the public record says
Provide and Install: Lockout electrical for the two boilers- Do 1 boiler at a time Remove and dispose of the existing 2- RBI boilers - Crane and rigging cost - multi lifts will be needed Furnish and install 2 Lochinvar 2072 boilers - 2,070,000 BTU's each Re use existing (1) Tek mar controller for two boilers Connect the boilers to flue piping, gas lines and electrical Buffalo Permits Check/ test start up
Recorded milestones
- Permit issued
Milestones apply to the recorded permits. They do not confirm that an entire development is complete or a business is open. No opening date is inferred.