What the public record says
Scope of Work 1. Electrical Panelboard Installation Evaluate existing electrical equipment for compatibility, available capacity, and feeder requirements. Furnish and install one new panelboard at the designated location, including required feeder conductors, wiring method, fittings, overcurrent protection, grounding connections, and identification. Separate neutrals and equipment grounds where required for a subpanel installation. Terminate and identify circuits specifically included in the approved scope. Install the panel cover and circuit directory and verify installation and operation. 2. Dedicated Residential Elevator Circuit Install one dedicated 30-amp branch circuit from the approved electrical source to the designated elevator controller or connection point. Provide compatible overcurrent protection, conductors, wiring method, and equipment grounding. Complete connections and testing as permitted by the elevator equipment specifications and approved scope. 3. Dedicated Hot Tub Circuit Install one dedicated 50-amp, 240-volt branch circuit to the designated hot tub location. Provide appropriately sized conductors, approved wiring method, compatible GFCI protection, required equipment grounding and bonding, and a spa disconnect where required and included in the approved installation. Complete connections and test the circuit and GFCI protection. 4. Hardwired Combination Smoke/CO Alarms Furnish and install six hardwired combination smoke and carbon monoxide alarms with battery backup. Provide required wiring, mounting components, and interconnections where required and compatible with the existing conditions. Test each alarm and verify interconnection operation. 5. Switch, Receptacle, and GFCI Improvements Replace designated existing standard light switches, receptacles, and associated faceplates. Upgrade designated bathroom and garage receptacle locations with appropriate GFCI protection. Convert six existing duplex receptacle locations to approved
Recorded milestones
- Permit issued
Milestones apply to the recorded permits. They do not confirm that an entire development is complete or a business is open. No opening date is inferred.
Sources & confidence
Category labels may be inferred from official fields and scope descriptions. Related permits are grouped only where an explicit source project identifier is available. We do not combine unrelated permits merely because they share an address.
View original city source ↗Retrieved 11/11/2026, 4:40:19 PM. Latest successful source retrieval.