TX · CITY PAGE

AustinTX

The permits behind the work. The headlines around town. A closer look at your city.

300projects in this recent batch

135 with map locations

Retrieved 11/3/2026
LOCAL NEWS

In the news around Austin.

Share a local update ↗

No local headlines yet

We haven’t connected a publisher feed for Austin yet. You can still share a source-backed community update for review.

Request local coverage →

Food & drink

Based on permit descriptions · classifications may be inferred
Issued

2500 S US 183 HWY SB UNIT 370

Bldg 3 Unit 370- NEW ABOVE-GROUND LP (PROPANE) GAS PIPING INSTALLATION COMMERCIAL ROASTING EQUIPMENT. This is a standalone new-work trade permit (gas piping) NOT a repair permit. No existing gas piping is being repaired replaced or altered; this is new piping to a newly installed appliance. PURPOSE: Install new above-ground LP gas piping to supply a commercial coffee roaster (IMF RM-15A_STD manufacturer data sheet Doc ST_00) inside the modular building at this address. Piping runs from the roasters gas train inlet connection to a new exterior termination stub at the rear exterior wall of the modular building. The exterior stub is a dead-end termination point only valved and capped for future connection by the propane supplier. Contractor scope ends at the exterior stub; it does NOT include the propane tank exterior regulators or any underground/trenched piping from the tank to the stub; that work is performed separately by the propane supply company. WORK DIMENSIONS: Total piping run approximately 25 to 35 feet (35 ft design basis) routed above ground through the rear interior of the modular building to an exterior wall penetration terminating at an exterior stub at the rear of the building. Pipe size: 3/4 in nominal Schedule 40 black steel trunk line reduced to 1/2 in NPT at the roasters gas train connection. Scope includes: pipe sizing and installation appliance shutoff valve at the roaster union sediment trap (drip leg) wall penetration with sleeve and seal exterior stub termination (valved and capped) pressure test and leak test of all new piping and coordination of required city inspections. No underground piping by the applicant. APPLIANCE DIMENSIONS AND SPECS (IMF RM-15A_STD data sheet): Overall dimensions 87.16 in L x 41.73 in W x 76.45 in H; weight 1433 lb (650 kg); burner Riello Gulliver BS1F LPG; maximum thermal input 178000 BTU/hr; LPG consumption 8.4 lb/hr; required inlet pressure minimum 12 in WC maximum 48 in WC; gas train connection 1/2 in; c

1 permit · 2026-10-08View record & timeline ↗
Issued

835 W 6TH ST UNIT 1000

Interior Remodel - Game Testing Coffee Bar and Game Observation Room.

1 permit · 2026-07-14View record & timeline ↗
Issued

1200 BARBARA JORDAN BLVD UNIT 340

Interior tenant build-out of an existing vacant restaurant space for a Firehouse Subs quick-service restaurant; includes architectural MEP kitchen equipment and finishes.

1 permit · 2026-08-14View record & timeline ↗

Retail

Based on permit descriptions · classifications may be inferred

Housing

Based on permit descriptions · classifications may be inferred

Health & wellness

Based on permit descriptions · classifications may be inferred

Opening something in Austin?

Submit an announcement or correction for review. Factual updates are free.

Share an update →
One email a week about your area.

New permits, local headlines and businesses near you. Unsubscribe any time.

Sign up freeLocal servicesContact us